Construction Management Services Scope: What Commercial Owners Should Expect

Construction managers reviewing blueprints at an active commercial construction site

Construction management services cover three phases: pre-construction planning, construction administration and field coordination, and post-construction startup and closeout. What a firm owes you depends on its contract role, because a construction manager as agent advises the owner, while one at risk holds the trade contracts and commits to a price.

Lipsky Construction provides construction management support for commercial, institutional, nonprofit, and religious building owners on Long Island and across the New York metro area. This guide lays out the scope by phase, the deliverables to require, and the questions to settle before you sign.

Key Takeaways

  • Construction management services span pre-construction, construction, and post-construction.
  • The contract role, agent or at risk, decides who holds trade contracts and who carries cost risk.
  • The most valuable work happens during design, when estimates and constructability reviews can still change the drawings.
  • Require named deliverables: estimates at each design milestone, a schedule, a quality plan, and change order tracking.
  • Set report frequency and approval tracking in the agreement.
  • A construction manager’s fee is separate from an owner’s representative fee.

What Construction Management Services Include

Construction management services are the planning, coordination, and control duties a firm performs to deliver a building on budget, on schedule, and to the specified quality. Commercial scopes usually cover cost management, scheduling, procurement support, contract administration, quality control, safety coordination, and closeout. If you need the basic definition first, the Lipsky guide to construction management in commercial construction covers it.

Published service lists differ in length. One firm lists 44 services grouped into pre-construction, construction, and post-construction, while others describe four or five categories. The count is less useful than a clear answer to three questions: what is the firm responsible for, what does it deliver in writing, and who decides when something changes?

Start With the Contract Role: Agent or At Risk

The same title can describe two different jobs. Bricker Graydon, an Ohio law firm, summarizes the split this way: a construction manager as agent does not hold, and cannot directly enforce, the contracts of the firms performing the work, while a construction manager at risk holds all of the subcontracts and provides a guaranteed maximum price. That difference changes the scope, so confirm which role a firm is proposing.

Scope item Construction manager as agent Construction manager at risk
Trade contracts The owner holds them. The manager cannot directly enforce them. The manager holds all subcontracts.
Price commitment Advisory, nonbinding estimates Guaranteed maximum price, sometimes set later in design
Cost overrun risk Stays with the owner Manager’s fee includes a contingency for overruns
Contract actions Taken by the owner Owner holds one prime contract with the manager
Tends to fit Owners who want direct control over each bid package Owners who want one accountable party and a price commitment

Neither role is better in general. Agency work gives the owner direct control over each bid package and more of the risk. At-risk work shifts risk to the manager and often brings the firm in during design, so the owner commits to it earlier.

Under an agency arrangement the owner keeps control and carries more risk, since any action on the construction contracts must be taken by the owner. Under an at-risk arrangement the owner gets one accountable party, and the manager’s fee must account for overrun risk. Public projects follow their own procurement rules, so check with counsel before choosing either model.

Construction Management Services by Phase

Pre-Construction

The manager tests cost, schedule, and buildability while the drawings can still change. Expect these services:

  • Budgeting and cost modeling at each design phase
  • Value engineering and constructability reviews, with cost impacts stated
  • Master schedule, phasing, and site logistics planning
  • Identification and early ordering of long-lead materials
  • Trade prequalification, bid package definition, bid review, and an award recommendation

Owners who want to see how this phase works in detail can review pre-construction planning, since the manager’s design-phase reviews feed directly into it.

Early ordering matters most for long-lead equipment. Items such as generators, rooftop units, and storefront systems can drive the opening date, so a manager who flags them at design development protects the schedule more than any recovery plan can later.

Construction

During construction, the manager keeps cost, schedule, and quality visible to the owner. Expect these services:

  • Administration of trade contracts, or advice on them under an agency role
  • Updated and look-ahead schedules, with recovery plans when work slips
  • Monthly cost reports with a forecast to completion
  • Change order analysis, negotiation support, and tracking
  • A quality control plan, safety coordination, and field coordination of trades and deliveries

Post-Construction

The manager closes the loop between the finished building and the contract. Expect these services:

  • Punch list tracking and verified completion
  • Commissioning coordination and facility startup
  • Collection of closeout documents, warranties, and manuals
  • Coordination of furniture and equipment deliveries
  • Claims avoidance and dispute resolution support

Deliverables and Reporting to Require

A construction manager’s value shows up in documents. A large public university’s deliverables checklist for its construction managers, dated August 2025, is a useful benchmark for a guaranteed maximum price project. It asks for a preliminary schedule and site logistics plan at the first pre-construction meeting, due within 14 days of notice to proceed, and an administrative management plan within 30 days of that meeting. That plan covers quality control, change and budget management, health and safety, and trade prequalification.

The same checklist requires cost estimates at schematic design, design development, and 95% construction documents, a constructability review at each design phase, and an award recommendation package with a bid tab. It leaves reporting frequency open, which owners can close in their own agreement, for example with weekly coordination meetings and monthly cost and schedule reports. An independent reviewer can check those reports, and owner’s rep services show how that review is usually organized.

Construction management services in Long Beach, NY at active commercial jobsite

Long Island Scope Items to Name in Writing

Local approvals can set the schedule. A commercial project on Long Island may need a town or village building department, zoning or planning board approval, county reviews, and a fire marshal, and coastal sites add flood zone compliance and stormwater management. Publicly funded work can also carry prevailing wage requirements under New York Labor Law.

A good scope names who tracks each approval, who submits it, and who owns the schedule risk if it slips. Those lines are easy to overlook in a proposal and expensive to argue about later. Ask any firm to show an approval schedule from a comparable Long Island project, not only a generic template.

Fees and Related Roles

A construction manager’s fee is a separate budget line from owner’s rep cost, so confirm that no proposal assumes one covers the other. Agency fees pay for management services, and at-risk fees are set in the proposal and must account for contingency.

Owners also compare the roles directly. The difference between a construction manager vs owner’s rep comes down to who manages the construction process and who advises the owner on the decisions around it. Many owners add an owner’s representative when they want an independent check on the manager’s reports.

Things to Know

  • Confirm in writing whether the firm is acting as agent or at risk.
  • Ask who holds the trade contracts and who carries cost overrun risk.
  • Hire the manager during design, not after bids are in.
  • Name each deliverable and how often it arrives.
  • Assign every local approval to a named party.
  • Have counsel review the agreement, since contract terms vary and public work follows its own rules.

Frequently Asked Questions

What do construction management services include?

Pre-construction planning, construction-phase administration, and post-construction startup and closeout.

That means budgeting, scheduling, bid and contract support, cost control, change order handling, quality and safety coordination, commissioning, and closeout. The exact duties depend on whether the firm serves as agent or at risk, so confirm the role in writing.

What is the difference between construction manager as agent and at risk?

An agent advises the owner and holds no trade contracts, while an at-risk manager holds them and guarantees a price.

Under an agency arrangement, any action on the construction contracts is taken by the owner. Under an at-risk arrangement, the manager provides a guaranteed maximum price and carries cost overrun risk through its fee and contingency. Legal terms vary by contract, so have counsel review either one.

When should an owner hire a construction manager?

During design, before the drawings are final.

Cost estimates, value engineering, and constructability reviews are most useful at schematic design and design development, when changes are still inexpensive. A manager hired after bidding can still administer construction, but it cannot influence the design that set the budget.

What deliverables should a construction manager provide?

Cost estimates, a schedule, a quality control plan, change order tracking, regular reports, and closeout documents.

Ask for estimates at each design milestone, a bid comparison with an award recommendation, and a written plan for safety and site logistics. Set the report frequency in the agreement, for example weekly coordination meetings and monthly cost and schedule reports.

Does a construction manager replace an owner’s representative?

Not automatically, because the two roles answer different questions.

A construction manager manages how the building gets built. An owner’s representative advises the owner on decisions around the project and checks the reports. Some owners use both, especially when they want an independent review of cost and schedule.

Writing a Construction Management Scope You Can Hold Firms To

Start with the contract role, then walk each phase and mark the services, deliverables, and report dates you expect. Send the same scope to every firm so the proposals are comparable. A scope that names the role, the deliverables, and the approvals leaves little room for surprises once construction starts.

Lipsky Construction has built on Long Island for more than 45 years and supports commercial, institutional, nonprofit, and religious owners with construction management. To talk through a scope for your project, contact Lipsky Construction.